Search
  Search
  Search
  Search

Future Libraries: Expansions and Improvements

Your source for everything related to the Deschutes Public Library bond measure. Voters approved Bond Measure 9-139 to construct a world-class Central Library as well as double the size and collection of the Redmond Library and remodel and update existing libraries.

Multi-purpose Meeting Rooms
Large and divisible meeting spaces are available to the community during the day and for after-hour meetings/gatherings.

Creative/DIY Space
Highly functional spaces provide opportunities for creative, hands-on activities and programs for all ages. Adjoining smaller rooms are available for recording, filming, and collaborating.

Books and Materials Displays
New and best-selling books are on display for the public to browse and check out.

Proposed Level 1 Floor Plan

Children’s Discovery Space
Children of all ages enjoy a dynamic discovery space for interactive play and learning, as well as a story time area.

Civic Patio
A covered patio creates an inviting space for all ages to gather and enjoy the outdoors. The patio faces the civic center across the street and provides outdoor space for special programs and events.


On the second level, adults and teens enjoy a collaborative/co-working area, tutor rooms, a dedicated teen space, ample seating, and technology access throughout, as well as natural light beaming through large windows and skylights. The second floor also holds the majority of the materials collection.

Tutor/Meeting Rooms
Meeting rooms address the increased demand for study/tutor spaces

Collab/Co-Working Area
A generous area dedicated to co-working for students and working professionals allows for collaboration and access to library resources.

Teen Space
Teens meet, study, and create in a space all their own.

Proposed Level 2 Floor Plan

Open Seating/Technology Access
Ample seating and access to technology is available throughout the second floor. Seating along the windows maximizes the views.


On the second level, adults and teens enjoy a collaborative/co-working area, tutor rooms, a dedicated teen space, ample seating, and technology access throughout, as well as natural light beaming through large windows and skylights. The second floor also holds the majority of the materials collection.

Solar Panels/EV Charging Stations
The Redmond Library is committed to meeting its net-zero goals by maximizing the use of solar panels on the roof and over parking stalls, as well as providing electric vehicle (EV) charging stations.

Drive-up Window
Customers can pick-up materials at the convenient drive-up window when the library is open and drop off materials through the library’s after-hours book return.

History Walk
The library extends the Redmond History Walk onto its property with special recognition of the Jesse Hill School and the original librarians who served the community for several decades.

Proposed Level 3 Floor Plan

Page Last Modified Wednesday, July 13, 2022


Top